Your search resulted in 3 documents.


Balance of arsenic and recycling
2002 - IRG/WP 02-50189
Instead of importing considerable quantities of arsenic to Europe, it would be sensible to utilize the arsenic recovered in the recycling process in the manufacture of CCA-wood, in the metallurgical industry as well as in other ways. When copper is also processed into a form easy to utilize, it may be possible to utilize chrome as well. When these developments are implemented, it can be said th...
L Lindroos


Recycling of impregnated timber: Part 2: Combustion trial
1999 - IRG/WP 99-50132
Totally 270 m3 (61,3 t) of CCA impregnated wood was chipped and incinerated at the combustion plant of Jalasjärvi. After the normal gas cleaning venture scrubbers were tested. After the trial a metal balance was calculated. Ash was treated at the copper smelter of Outokumpu Harjavalta Metals Oy. Condensate waters were transfered to the Outokumpu's CCA production plant and utilized by the...
L Lindroos


Recycling of treated timber by copper smelter
1994 - IRG/WP 94-50030
A preliminary trial was carried out to see whether copper smelting process is able to recycle CCA treated timber. As a result of the first trial almost a full recovery of both copper and arsenic was achieved. Recovered metals were utilized in manufacturing CCA preservatives. The energy bound in wood is utilized in the flash smelting process and the burning gases are fed to the sulphuric acid plant...
A J Nurmi, L Lindroos